DESIGN CONSULTATION
Thorough, Value-Adding Design Help
DESIGN CONSULTATION
The usual method of estimating a project centered on tonnage opens the door for challenges with accurateness. We know that spending the time “up front” pays dividends in the long run. With our estimating process we input modeling that we apply labor values to, followed by doing “solid take-offs” of literally each piece of metal. The end result is an estimation in which we have a very high-degree of confidence.
​
The outmoded process of estimating from years past is now a dying art, conversely, it wasn’t efficient either as it does not allow for transitional budget updates from plan modifications. With the Highline system, our capacity to estimate and be practical is unequaled.
​
Operating with historic data, our software similarly permits us to track diverse issues related with each project in addition to the costs.