top of page
CONTRACTOR
Sampson Construction
SQUARE FOOTAGE
70,000
LOCATION
Greenville, TX
PROJECT USE
Office
​
INNOVATION FIRST
PRE-ENGINEERED METAL BUILDING EREECTION
HSS was contracted to erect the metal building system which consisted of 4" Insulated Metal Panels on the roof and walls, a 30' x 200' covered parking area with standing seam roof and soffit panels, (16) curbs with skylights, and 300 l/f of below eave canopy with soffit.
bottom of page